How Many Quotes Should I Really Get Before Choosing a Contractor?

By Catherine Lavoie·6 min read·Published on July 22, 2026

The question comes up with every renovation project: how many quotes should you really get before signing with a contractor? Too few risks missing a better offer, but asking for too many needlessly delays the project.

The generally recommended number

Three quotes generally represent a good balance between having enough points of comparison and avoiding a process that drags on indefinitely. This number is enough to spot an abnormal price gap (too low or too high) while keeping the selection process manageable in terms of time.

Why the number alone isn't enough

What matters as much as the countWhy
Comparing quotes for an identical scope of workQuotes based on different descriptions aren't really comparable
Checking each bidder's RBQ licenseEliminates unqualified options before even comparing prices
Comparing proposed timelines, not just priceA lower price with an unrealistic timeline often hides problems
Checking references and recent reviewsA competitive price doesn't guarantee the final work's quality

How to make sure the quotes are truly comparable

Providing the same detailed description of the work to each contractor solicited, rather than letting each one interpret the project their own way, is essential for getting truly comparable quotes. A vague ask that leaves too much room for interpretation risks leading to cost surprises once the work begins.

Why the lowest quote isn't always the best

A quote noticeably lower than the others deserves careful scrutiny rather than immediate acceptance — it can reflect lower-quality materials, an underestimation of the actual scope of work, or a contractor looking to land the contract before adding extra fees along the way.

When more than three quotes can be justified

For a particularly complex or costly project, like a major addition, getting a fourth or fifth quote can be justified if the first three show significant, hard-to-explain gaps, or if the project touches structural elements that deserve several professional opinions before committing.

Frequently asked questions

Are free quotes really without obligation?+

Generally yes for a basic quote, though some contractors may charge for a more in-depth technical visit on complex projects.

How much time should I plan for getting three quotes?+

Generally plan for two to four weeks, the time it takes each contractor to visit the site and prepare a detailed quote.

Should I reveal the amount of other quotes to each contractor?+

It's generally not recommended — it can bias subsequent quotes rather than getting the real price each contractor would have proposed.

Is a verbal quote enough or should I always require a written document?+

Always require a detailed written document — a verbal quote offers no protection in case of disagreement over the agreed scope or price.